Bailiff’s Court Hotel

Bailiff’s Court Hotel

Electrical Services & Projects Ltd have been working with the estates dept. supplying Electrical Installations & Electrical Installation Condition Reports since 2009. We have liaised closely with the hotel during this time to reduce resident awareness of our presence whilst performing our duties.

A reaction time schedule plan is used to gauge the fault and our response time for attendance on site.

Within areas of constant use out of hours working is introduced to reduce disruption where this was unachievable for safety reasons additional engineers are made available to keep working time to a minimum.

Leave a Reply